feat(v0.4.0): vNext — closed-loop world model + settlement contract

Implements the vNext architecture from the research doc: demote the noisy
multi-rail planner in favour of a closed loop (world truth → invariant check)
plus a single utility-driven goal authority.

L1 services (fix no_drop / silent pathfinder hang first):
- InventoryLedger: diff-based "did I actually get it" verifier; acquire-food
  now confirms via ledger.gainedSince instead of the unreliable count/event.
- MotionService.gotoSafe: wall-clock timeout + progress watchdog +
  path_update(noPath/timeout) → structured {reached|stuck|timeout|nopath}.

L3 plan — unify the three competing rails (curriculum/manifesto/storyline):
- Settlement Contract: ordered M0–M9 milestones, each invariant-checked
  against an authoritative world view (early steps delegate to the proven
  curriculum; late game adds farming).
- InvariantChecker + predicate library; GoalManager selects the lowest unmet
  milestone via utility argmax (food-urgency preempts, DEPS-style).
- Wired into the scheduler: bot.js precomputes snapshot.contract; reflex.js
  consumes it in place of the storyline rail. Manifesto L0 still preempts.

Eval + robustness:
- Village Score (single 0..1 metric) on the snapshot + TUI "build" line.
- survive.dig-in skill + dusk_dig_in mode (exposed at night, no bed → cover).
- approach_block helper (GoalNear + lookAt, avoids GoalLookAtBlock #341).

+28 new tests (450 total green). LLM remains entirely off the tick path.

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
This commit is contained in:
2026-05-28 11:05:43 +03:00
co-authored by Claude Opus 4.7
parent 15b6c11002
commit 2a6cc0cdb1
23 changed files with 1662 additions and 36 deletions
+2 -2
View File
@@ -1,12 +1,12 @@
{
"name": "pepa-pi-bot",
"version": "0.2.0-rc.1",
"version": "0.4.0",
"lockfileVersion": 3,
"requires": true,
"packages": {
"": {
"name": "pepa-pi-bot",
"version": "0.2.0-rc.1",
"version": "0.4.0",
"license": "MIT",
"dependencies": {
"better-sqlite3": "^11.10.0",